Tag Archives | Clear Creek Wastewater Treatment Plant

Clear Creek Wastewater Treatment Plant

We are scheduling our first 2024 Saturday visit to the ponds targeting waterfowl, shorebirds and wintering passerines. Assemble at the Treatment Plant’s Administration Building at the end of Metz Road at 7:30 am sharp to meet your leader, Tim Kashuba. This is a 1/2-day trip that may end in the early afternoon if the birding is good. Directions to the Clear Creek Plant: Take Hwy 273 south, after crossing Clear Creek and past the Win-River Casino, take the second left turn at River Ranch Road and cross over the railroad tracks. Turn left on Eastside Rd. Entrance is at 2200 Metz Road on the right. Rain cancels.

0

Clear Creek Wastewater Treatment Plant

Red-winged Blackbird Male

We are again scheduling a visit to the ponds targeting wintering waterfowl and early migrating shorebirds. We hope that the winter rains have provided abundant open water and muddy shorelines for these species. Assemble at the Treatment Plant’s Administration Building at the end of Metz Road at 7:30 am to meet your leader, Larry Jordan. This is a 1/2-day trip that may end in the early afternoon if the birding is good. Directions to the Clear Creek Plant: Take Hwy 273 south from Redding and look for River Ranch Road after crossing Clear Creek. Cross over the Railroad tracks and turn left on Eastside Rd. Entrance is on Metz Road on the right. Contact webmaster@wintuaudubon.com for more information.

0